Involvement In Research / Consultancy Projects as Project Leader
Research / Consultancy Projects (Above 5 Lakh) – Ongoing
MoEF & CC's Compliance Studies on Impact on Large Water Body and Agricultural Crop, Carbon Emission Monitoring and Water Audit for Kawai TPP at Baran, Rajasthan, Spn. Adani Power Limited (Project cost: Rs. 17,46,400/- duration: 8 month)
MoEF & CC's Compliance Studies on Impact on Large Water Body and Agricultural Crop, Carbon Emission Footprint, Water & Energy Audit and Epidemiological Study for Korba TPP at Korba, Chattisgarh, Spn. Korba Power Ltd. Village - Pathadi, PO: Tilkeja, Korba, 495674, Chhattisgarh (Project Cost: Rs. 26,43,200/-, duration: 8 months)
MoEF & CC's Compliance Studies on Impact on Large Water Body and Agricultural Crop, Carbon Emission Monitoring, Water & Energy Audit, Baseline Health Assessment and Epidemiological Study for Raigarh TPP at Raigarh, Chattisgarh, Spn. Adani Power Ltd., Raigarh, Chhattisgarh (Project cost: Rs. 32,09,600/-, duration: 8 months)
MoEF & CC's Compliance Studies on Impact on Large Water Body and Agricultural Crop, Carbon Emission Monitoring, Water & Energy Audit, Baseline Health Assessment and Epidemiological Study for Raipur TPP at Raipur, Chattisgarh, Spn. Adani Power Limited, Village: Raikheda, Block: Tilda, Raipur (Project Cost: Rs. 32,09,600/-, duration: 8 months)
Social Impact Assessment, Need Assessment Survey & R&R Action Plan for Proposed Chappar USCTPP (4 x 800 MW) at Village Kokrajhar, Assam, Spn. Adani Power Ltd, LGBI Airport, Borjhar, Guwahati, Kamrup, Assam (Project Cost: Rs. 15,34,000/-, duration: 3 months).
Water Source Sustainability Study for Drawl of Water from Brahmaputra River for Proposed Chappar USCTPP (4 x 800 MW) at Village Kokrajhar, Assam, Spn Adani Power Ltd, LGBI Airport, Borjhar, Guwahati, Kamrup, Assam (Project Cost: Rs. 19,76,500/-, duration: 3 months).
Impact on Agricultural Crop and Large Water Bodies due to Operation of Mahan USCTPP (2x800 MW) at Singrauli, Madhya Pradesh, Spn. Adani Mahan Energen Limited, Singrauli, Madhya Pradesh (Project Cost: Rs. 7,02,100/- duration: 8 months)
Water and Energy Audit of Mahan USCTPP (2x800 MW) at Singrauli, Madhya Pradesh, Spn. Adani Mahan Energen Limited, Singrauli, Madhya Pradesh (Project Cost: Rs. 11,77,640/- duration: 8 months)
Epidemiological Study of Mahan USCTPP (2x800 MW) at Singrauli, Madhya Pradesh, Spn. Adani Mahan Energen Limited, Singrauli, Madhya Pradesh (Project Cost: Rs. 7,55,200/- duration: 8 months)
Water Source Sustainability Study for Drawl of Water from Hasdeo River for proposed 3 x800 MW Super-Critical Thermal Power Project (SCTPP) of Korba Power Limited (KPL) at Korba District, Chattisgarh, Spn. Korba Power Limited (Formerly Known as Lanco Amarkantak Power Ltd.), Village - Pathadi, Tehsil – Korba District - Korba (Chhattisgarh), Executed in Association with CSIR-CGCRI, Kolkata (Project Cost: Rs. 19,76,500/- duration: 3 month).
Water Source Sustainability Study for Drawl of Water from Parwan River for Proposed Phase-II (4 x 800 MW) Expansion of USCTPP at Village Kawai, District Baran, Rajasthan, Spn. Adani Power Limited, Village: Kawai, District: Baran, Rajasthan (Project Cost: Rs. 19,76,500/- duration: 3 months).
Water Source Sustainability Study for Drawl of Water from River Ganga for Proposed 2 x 800 MW Coal Based Ultra Supercritical Thermal Power Project at Mirzapur, UP, Spn. Mirzapur Thermal Energy (UP) Pvt. Ltd., Mirzapur, U.P., Executed in Association with CSIR-CGCRI, Kolkata (Project Cost: Rs. 19,76,500/- duration: 3 months).
Social Impact Assessment Study, Need Assessment Survey & CSR Action Plan for proposed 2x800 MW Coal Based Ultra Super Critical Thermal Power at Mirzapur, UP, Spn. Mirzapur Thermal Energy (UP) Pvt. Ltd., Mirzapur, U.P., December, 2024 (Project Cost: Rs. 15,34,000/- duration: 3 months).
Social Impact Assessment, Need Assessment Survey & CSR Action Plan for Proposed Phase-II (4 x 800 MW) Expansion of USCTPP at Village Kawai, District Baran, Rajasthan, Spn. Adani Power Ltd., Village: Kawai, District: Baran, Rajasthan, July, 2025 (Project Cost: Rs. 15,34,000/- duration: 3 months).
Initial Environment Examination (IEE), Environment & Social Management Framework (ESMF) and Environment and Social Impact Assessment (ESIA) for Loss Reduction Work under RDSS Project in Selected Districts of West Bengal Funded by Asian Development Bank, Spn. West Bengal State Electricity Distribution Company Limited (WBSEDCL), Kolkata (Project Cost: Rs. 74,34,000/- duration: 1 yr 3 months)
Environmental & Social Including Health and Safety Safeguard Supervision and Monitoring for Loss Reduction Work under RDSS Project in Selected Districts of West Bengal Funded by ADB, Spn. West Bengal State Electricity Distribution Company Limited (WBSEDCL), Kolkata (Project Cost: Rs. 3,65,32,800/- duration: 3 year)
Peripheral Green Belt Development Plan for Mahan Thermal Power Plant, Spn. Adani Mahan Energen Limited, Village: Banduara, District: Baldhan, Singrauli, April, 2024 (Project Cost: Rs. 5,35,000/- duration: 6 months).
GHG Emission Accounting for Mahan Thermal Power Plant, Spn. Adani Mahan Energen Limited, Village: Banduara, District: Baldhan, Singrauli, June, 2024 (Project Cost: Rs. 13,57,000/- duration: 6 months).
Baseline Health Status around Mahan TPP, Spn. Adani, Mahan Energen Limited, Singrauli, Madhya Pradesh, June, 2024 (Project Cost: Rs. 13,00,000/- duration: 6 months).
Ground Water Depletion/Augmentation Study and Hydo-Geological Study Including Rain Water Harvesting System for Mahan Thermal Power Plant (2x600 MW), Village: Bandhoura, Dist.: Singrauli, Madhya Pradesh, Spn. Mahan Energen Limited, Singrauli, Madhya Pradesh, April, 2024 (Project Cost: Rs. 9,02,700/- duration: 6 months).
Waste Management including Hazardous and Plastic Waste in Tribal Areas of West Bengal, Spn. West Bengal Pollution Control Board, Dept of Environment, Government of West Bengal, (Project Cost: Rs. 19,51,248/-, Duration: 8 month)
Waste Management including Hazardous and Plastic Waste in Rural Areas of West Bengal, Spn. West Bengal Pollution Control Board, Dept of Environment, Government of West Bengal, (Project Cost: Rs. 35,12,860/-, Duration: 8 month)
Life Cycle Assessment of Phosphatic Fertilizer Products of IIPL in Association with Jadavpur University, Spn. Indorama India Pvt Ltd, Fertilizer Division, Durgachak, Haldia, Dec 2023 (Project Cost: Rs. 11,65,000/-, Duration: 8 month).
Source Sustainability Study for Drawl of Water from River Mahanadi for Expansion Projects (2 x 800 MW) Ultra Super-Critical TPP of REL and REGL at Raipur, Vill. Raikheda, Block: Tilda, Chattisgarh, Spn. Raipur Energen Limited, Raipur & Raigarh Energy Generation Limited, Raigarh, Chattisgarh, January 2024 (Project Cost: Rs. 38,53,000/- (19,76,500/- each), Duration: 3 month).
Assessment of Mahanadi River Morphology and Hydrology at Proposed Water Intake Site as a Part of Water Source Sustainability Study of Mahan TPP Expansion Project (2x800 MW), Singrauli, Madhya Pradesh, Spn. Mahan Energen Limited (Project Cost: Rs. 1,18,000/- duration: 3 month).
Source Sustainability Study for Drawl of Water from River Mahanadi for Proposed Expansion (2 x 800 MW) of Ultra Super-Critical TPP of APL Raigarh, Vill. Chote Bhandar, Block: Pussore, Dist. Raigarh Chattisgarh, Spn. Adani Power Limited, Raigarh, In Technical Collaboration with CSIR-CGCRI, March 2024 (Project Cost: Rs. 19,76,500/-, Duration: 3 month).
Source Sustainability Study for Drawl of Water from River Mahanadi for Proposed Expansion (2 x 800 MW) of Ultra Super-Critical TPP of APL Raipur, Vill. Raikheda, Block: Tilda, Dist. Raipur Chattisgarh, Spn. Adani Power Limited, Raipur, In Technical Collaboration with CSIR-CGCRI, March 2024 (Project Cost: Rs. 19,76,500/-, Duration: 3 month).
Social Impact Assessment Study, Need Assessment Survey & CSR Activities for Expansion Projects (2 x 800 MW) of REL & REGL, Spn. Raipur Energen Limited & Raigarh Energy Generation Limited (Project Cost: Rs. 33,74,800/-, Duration: 3 month).
Social Impact Assessment Study, Need Assessment Survey & CSR Action Plan for Proposed Expansion Project of 2x800 MW Ultra Super Critical Thermal Power Project at Village Raikheda, Block Tilda, Raipur, Chattisgarh, Spn. Adani Power Limited, Village Raikheda, Block Tilda, Raipur, Chattisgarh (Project Cost: Rs. 15,34,000/-, duration: 3 months).
Social Impact Evaluation and Social Audit for Thermal Power Plant at Village Raikheda, Block Tilda, Dist Raipur, Chattisgarh, Spn. Adani Power Limited, Village Raikheda, Block Tilda, Raipur, Chattisgarh (Project Cost: Rs. 5,31,000/-, duration: 3 months).
Social Impact Assessment Study, Need Assessment Survey and & CSR Action Plan for Proposed Expansion Project of 2 x 800 MW Ultra Super Critical Thermal Power Project at Raigarh, Chhattisgarh Spn. Adani Power Limited, Village Chhote Bhandar, PO Bade Bhandar, Tehsil Pussore, Raigarh, Chhattisgarh (Project Cost: Rs. 15,34,000/-, duration: 3 months).
Wildlife Management Plan including Soil Erosion Mitigation Plan for 400 kV D/C Transmission Line from North Karanpura to Chandwa and Gaya, Spn. Adani Power Limited, Ahmedabad, Gujrat (Project Cost: Rs. 5,90,000/-, duration: 6 months).
Development of Hazardous Waste Generation Factors & Environmental Benchmarks, Formulating Action Plan for Hazardous Waste Management of West Bengal & Evolution of Software Programs for Hazardous & Other Wastes Inventory as per Guidelines of CPCB and Directions of Hon’ble National Green Tribunal (Phase II), Spn. West Bengal Pollution Control Board (WBPCB), Kolkata (Project Cost: Rs. 11,70,000/- 13,80,600/-, duration: 1 year).
Social Impact Assessment (SIA) Study, Corporate Social Responsibility (CSR) Study, Need Based Assessment (NBA) Survey and Community Engagement/Development Plan and Resettlement & Rehabilitation (R&R) Study for Proposed 1600 (2 x 800) MW Coal Based Ultra Super Critical Thermal Power Plant at Singrauli, Madhya Pradesh (Phase II), Spn. Pench Thermal Energy (MP) Limited, Adani, Madhya Pradesh (Project Cost: Rs. 13,00,000/-, duration: 6 month).
Environmental & Social Impact Assessment Study and Formulation of Environmental & Social Management Framework for Distribution Network Strengthening with HVDS, LT AB Cabling, 33/11 KV GIS Sub-Station & Underground Electrical Cabling Network for Selected Districts of West Bengal under World Bank Fund Assistance, Spn. West Bengal State Electricity Distribution Company Limited, Kolkata (Project Cost: Rs. 34,00,000/-, duration: 1 year).
Formulation of Comprehensive Action Plan of KMC for Improvement of Air Quality of Kolkata City as per Directives of National Green Tribunal, Spn. The Kolkata Municipal Corporation, Solid Waste Management (SWM), Kolkata (Project Cost: Rs. 6,00,000/-, duration: 1 month).
Source Sustainability Study for Drawl of Water from River Mahanadi for Proposed Expansion of Thermal Power Plant (2 x 660 MW) at Raigarh, Chattisgarh, Spn. Korba West Power Company Limited, Ahmedabad, Gujarat, In Technical Collaboration with CSIR-CGCRI, Kolkata (Project Cost: Rs. 14,85,000/-, duration: 4 months).
Social Impact Assessment Study & R&R Action Plan for Proposed development of Port Facilities at Sagar Island With Rail Road Connectivity in the District of South 24 Pgs, West Bengal, Spn. Kolkata Port Trust, Kolkata (Project Cost: Rs. 8,85,000/-, duration: 3½ months).
Socio-Economic Impact Assessment, R&R Action Plan and CSR Activities For Andal East Coal Block, Spn. Andal East Coal Company Private Limited, Kolkata (Project Cost: Rs. 8,25,000/-, duration: 4 months).
Socio-Economic Impact Assessment, R&R Action Plan and CSR Activities for Jaganathpur “A” & “B” Underground Coal Mine Projects at Ranigang Coalfield, Spn. West Bengal Mineral Development & Trading Corporation Limited, Kolkata (Project Cost: Rs. 8,55,000/-, duration: 6 months).
Research Projects (Above 5 Lakh) - Completed
Impact Assessment on Water Body Due to Operation of Mahan TPP Expansion Project (Ph-III), Spn. Adani Power, Mahan Energen Limited, Vill-Bandhuara, Block-Baidhan, Singrauli (MP), November, 2025.
Surface Water Body Impact Assessment of Operation of Mahan TPP Expansion Project (Ph-III), Spn. Adani Power, Mahan Energen Limited, Vill-Bandhuara, Block-Baidhan, Singrauli (MP), November, 2025.
Social Impact Assessment, Need Assessment Survey & CSR Action Plan for Proposed Salboni USCTPP (2x800 MW) at Salboni, Paschim Medinipur, Spn. JSW Thermal Energy Limited (JSWTEL), Paschim Medinipur, West Bengal, October 2025 (Project Cost: Rs. 15,34,000/- duration: 3 month).
Agricultural Impact Assessment of Operation of Mahan TPP Expansion Project, Spn. Adani Power, Mahan Energen Limited, Vill-Bandhuara, Block-Baidhan, Singrauli (MP), December, 2025.
Conservation & Management Plan on Dolphin & Other Aquatic Biodiversity for Proposed Pirpainti USCTPP (3 x 800 MW) at Bhagalpur, Bihar, Spn. Adani Power Limited, Bhagalpur, Bihar, In Association with NABET Accredited Ecology & Biodiversity Expert, January, 2026 (Project Cost: Rs. 7,49,300/- duration: 8 month) (179).
Impact Assessment on Waterbody Due To Operation of Mahan TPP Expansion Project, Spn. Adani Power, Mahan Energen Limited, Vill – Bandhuara, Block - Baidhan Singrauli (MP), December, 2025
Biodiversity Assessment and Wildlife Conservation And Management Plan for Proposed USCTPP at Chapar Dhubri District, Assam, Spn. Adani Power Limited, Dhubri, Assam, February, 20268.
Water Audit of Mahan Thermal Power Plant of Mahan Energen Limited, Spn. Adani Power, Mahan Energen Limited, Vill - Bandhuara, Block – Baidhan Singrauli (MP), December, 2025.
Social Impact Assessment, Need Assessment Survey & R&R Action Plan for Proposed Pirpainti USCTPP (3 x 800 MW) at Bhagalpur, Bihar, Spn. Adani Power Limited – Pirpainti, Bhagalpur, Bihar, December, 2025 (Project Cost: Rs. 15,34,000/- duration: 3 month).
Water Source Sustainability Study for Drawl of Water from Ganga River for Proposed Pirpainti USCTPP (3 x 800 MW) at Bhagalpur, Bihar, Spn. Adani Power Limited, Village - Sirmatpur, Block – Pirpainti, District - Bhagalpur (Bihar), December, 2025 (Project Cost: Rs. 19,76,500/- duration: 3 month).
Decarbonization Action Plan for Nilanchal Thermal Power Plant, Spn. Adani, Orissa Thermal Energy Limited, Villages – Rahangol & Kandarei, Tehsil – Athagarh, District – Cuttack (Odisha), May, 2025.
Energy Audit of Mahan Thermal Power Plant (2x600 Mw) of MEL, Spn. Adani Power, Mahan Energen Limited, Villages - Bandhaura, Khairahi, Karsualal and Nagwa, District – Singrauli (Madhya Pradesh), October, 2025.
Baseline Health Status around Nilanchal TPP, Spn. Adani Power, Orissa Thermal Energy Limited Cuttack, Odisha, June, 2025.
Water Source Sustainability Study for Drawl of Water from Mahanadi River for Proposed USCTPP at Cuttack, Orissa Spn. Orissa Thermal Energy Limited Villages - Rahangol and Kandarei, Tehsil - Athagarh District – Cuttack (Odisha), May, 2025 (Project Cost: Rs. 19,76,500/- duration: 3 month).
Social Impact Assessment, Need Assessment Survey & CSR Action Plan for Proposed Nilanchal USCTPP (3x800 MW) at Cuttack, Orissa, Spn. Orissa Thermal Energy Limited, Cuttack, Odisha, February, 2025 (Project Cost: Rs. 15,34,000/- duration: 3 month).
Ecological Assessment and Wildlife Conservation and Management Plan for Proposed USCTPP of OTEL at Cuttack District, Odisha, Spn. Adani Power, Orissa Thermal Energy Limited Cuttack, Odisha, June, 2025.
Social Impact Assessment, Need Assessment Survey & CSR Action Plan for proposed 3 x800 MW Super-Critical Thermal Power Project (SCTPP) of Korba Power Limited (KPL) at Korba District, Chattisgarh, Spn. Korba Power Limited (Formerly Known as Lanco Amarkantak Power Ltd.), Village Pathadi, P.O. Tilkeja, Dist. Korba, Chattisgarh, February, 2025 (Project Cost: Rs. 15,34,000/- duration: 3 month).
Micro Watershed Development Plan for Proposed Expansion of Thermal Power Plant by Adani Power Limited, Raigarh, Spn. Adani Power Limited, Village- Chote Bhandar, Block-Pussore District- Raigarh (Chhattisgarh), August, 2024.
Micro Watershed Study for Proposed USCTPP Expansion Project (2 x 800 MW) of Adani Power Limited, Raigarh, Spn. Adani Power Limited, Village- Chote Bhandar, Block-Pussore District- Raigarh (Chhattisgarh), August, 2024.
Social Impact Assessment, Need Assessment Survey & CSR Action Plan for proposed Project of 4x800 MW Anuppur Ultra Super Critical Thermal Power Plant at Anuppur, Madhya Pradesh, Spn. Anuppur Thermal Energy (MP) Pvt Limited, Anuppur, Madhya Pradesh, April, 2025 (Project Cost: Rs. 15,34,000/- duration: 3 month)
Water Source Sustainability Study for Drawl of Water from Kewai/Sone River for proposed Project of 4x800 MW Anuppur Ultra Super Critical Thermal Power Plant at Anuppur, Madhya Pradesh, Spn. Anuppur Thermal Energy Pvt. Ltd (ATEMPPL), Village: Chandrauthi, Kotma Annupur Madhya Pradesh, Executed in Association with CSIR-CGCRI, Kolkata (Project Cost: Rs. 19,76,500/- duration: 3 month)
Ecological Assessment and Wildlife Conservation and Management Plan for the Proposed USCTPP of ATEMPPL at Anuppur District, Madhya Pradesh, Spn. Anuppur Thermal Energy (MP) Private Limited Anuppur, Madhya Pradesh (Project Cost: Rs. 19,76,500/- duration: 3 month)
Baseline Socio-Economic Survey & Need Assessment Study of Selected CSR Villagers Around 132/33 kV Sorda GSS under Sirohi and Jalore Districts of Rajasthan, Spn. Adani Transmission Limited (ATL), Rajasthan, September, 2022 (Project Cost: Rs. 5,00,000/-, Duration: 3 month).
Environmental Impact Assessment and Environment Management Plan for Water Intake Jetty of Surface Water Supply Scheme for Balagarh-Pandua of Hooghly District under Public Health Engineering Directorate, Government of West Bengal, Spn. GAJA Engineering Pvt Limited, June, 2022 (Project Cost: Rs. 8,00,000/-, Duration: 4 month).
Need Based Social Impact Assessment Study and R&R Study for proposed Expansion Project of 2x800 MW (Phase III) Ultra Super Critical Thermal Power at Singrauli, Madhya Pradesh, Spn. Mahan Energen Limited, Singrauli, Madhya Pradesh, October, 2024 (Project Cost: Rs. 15,34,000/- duration: 3 months).
Source Sustainability Study for Drawl of Water from River Rihand for Mahan USCTPP Expansion Project (2x800 MW) Phase III at Singrauli, MP, Spn. Mahan Energen Limited, Singrauli, Madhya Pradesh, October, 2024 (Project Cost: Rs. 3,01,500/- duration: 3 months).
MoEF & CC's Compliance Studies (i.e. Peripheral Green Belt Development and Watershed Management Plan, Baseline Health Assessment and Carbon Emission Monitoring) for 2 x 800 MW Mahan Ultra Super Critical Thermal Power Project (Phase II) at Singrauli, Madhya Pradesh, Spn. Mahan Energen Limited, Village Bandhoura, PO Karsualal, District Singrauli, Madhya Pradesh (Project Cost: Rs. 21,24,000/- duration: 6 months).
Site Specific Wildlife Conservation Plan & Soil Erosion Mitigation Plan for 400 kv HT Line from North Karanpura to Chandwa, Jharkhand and Gaya, Bihar of North Karanpura Transco Limited, Spn. North Karanpura Transco Ltd., January, 2022 (Project Cost: Rs. 5,90,000/-, Duration: 6 month).
Site Specific Wildlife Conservation Plan for 66 kV Transmission Line from Godda Thermal Power Plant to Water Intake System near River Ganga at Sahibgunj, Jharkhand, Spn. Adani Power (Jharkhand) Limited, Godda, Jharkhand, November, 2021 (Project Cost: Rs. 5,90,000/-, Duration: 6 month).
Remediation of Marshy Land Using Phytoremediation Techniques at Gomia Works of IEPL-ORICA (Conceptual Site Model and Plan & Design for Phytoremediation), Spn. ORICA, Indian Explosives Private Limited, Gomia Works, Jharkhand, July, 2021 (Project Cost: Rs. 9,91,200/- (Rs. 8,40,000/-), duration: 12 month).
Phytoremediation Trial Project for Marshy Land-I at Gomia Works (Phase II), Spn. ORICA, Indian Explosives Private Limited, Gomia Works, Jharkhand (Project Cost: Rs. 9,91,200/- (Rs. 8,40,000/-), duration: 12 month).
Water Budgeting Study for Tiroda Thermal Power Plant (5 x 660 MW), Spn. Adani Power Maharashtra Limited, Gondia, Maharashtra, March, 2021 (Project Cost: Rs. 9,26,300/-, duration: 3 months).
Undertaking Stakeholder Engagement and Rehabilitation & Resettlement Audit for 3300 MW Tiroda Thermal Power Plant at Village Tiroda, District Gondia, Maharashtra, Spn. Adani Power Maharashtra Ltd, Dist. Gondia, Maharashtra, March, 2020 (Project Cost: Rs. 6,00,000/-, duration: 6 month).
Inventorization of Hazardous Waste Generating Industries with Identification and Quantification of Hazardous Waste Generated in the State Based on Scientific Principle and to Conduct Environmental Audit of Common Hazardous Waste TSDF of West Bengal (Phase I), Spn. West Bengal Pollution Control Board (WBPCB), Kolkata, March, 2020 (Project Cost: Rs. 12,24,000/-, duration: 6 month).
Source Sustainability Study for Drawl of Water from River Wainganga for Tiroda Thermal Power Plant (5 x 660 MW) at Village Tiroda, District Gondia, Maharashtra, Spn. Adani Power Maharashtra Limited, Village: Tiroda, Dist.: Gondia, Maharashtra, In Technical Collaboration with CSIR-CGCRI, Kolkata, March, 2019 (Project Cost: Rs. 14,55,000/-, duration: 3 month).
Environmental, Social, Health & Safety Impact Assessment Study for Construction and Rehabilitation of Sewage Treatment Plants and Associated Infrastructure at Prayagraj, Uttar Pradesh under Allahabad
Development Authority, Government of Uttar Pradesh (under NMCG Project, Government of India and UP Jalnigam), Spn. Prayagraj Water Private Limited, Navrangpura, Ahmedabad, Gujarat, February, 2019 (Project Cost: Rs. 8,25,000/-, duration: 3 month).
Social Impact Assessment (SIA) Study, Corporate Social Responsibility (CSR) Study, Need Based Assessment (NBA) Survey and Community Engagement/Development Plan and Resettlement & Rehabilitation (R&R) Study for Proposed 1600 (2 x 800) MW Korba West Thermal Power Expansion Project at Bade Bhander, Chhote Bhandar Village, Raigarh, Chhattisgarh, Spn. Korba West Power Company Limited, Chattisgarh (Adani Infra (India) Limited), August, 2018 (Project Cost: Rs. 6,95,000/-, duration: 3 month).
Source Sustainability Study for Drawl of Water from River Ganga for Proposed Godda Thermal Power Plant (2 x 800 MW) in Jharkhand, Spn. Adani Power (Jharkhand) Limited, Ahmedabad, Gujarat, In Technical Collaboration with CSIR-CGCRI, Kolkata, July, 2018 (Project Cost: Rs. 15,95,000/-, duration: 4 months).
Dynamic Fare Pricing for Public Transport, Spn. Transport Department, Government of West Bengal, May, 2018 (Project Cost: Rs. 12,85,000/-, duration: 3 months).
Social Impact Assessment Study, CSR Study, Need Based Assessment (NBA) Survey, Community Engagement/Development Plan and Rehabilitation & Resettlement Action Plan for Proposed Godda Thermal Power Plant (2 X 800 MW) at Village: Motia, Tehsil: Godda, District: Godda, Jharkhand, Spn. Adani Power (Jharkhand) Ltd, Achalraj, Ahmedabad, Gujarat, December, 2016 (Project Cost: Rs. 16,90,000/-, duration: 3 months).
Environmental, Social & Health Impact Assessment Study For Underground Electrical Cabling Network Replacing Both HT & LT Overhead Lines at Digha-Sankarpur Area, East Medinipur, West Bengal under World Bank Project - NCRMP-II, Spn. West Bengal State Electricity Distribution Company Ltd, September, 2016 (Project Cost: Rs. 6,85,000/-, duration: 4 months).
Environmental Impact Assessment & Environment Management Plan for Water Intake Jetty of Mega Surface Water Supply Scheme for Habra Gaighata of North 24 Pgs District under Public Health Engineering Directorate, Government of West Bengal, Spn. Simplex Infrastructure Limited, Kolkata, June, 2016 (Project Cost: Rs. 7,00,000/-, duration: 3 months).
Social Impact Evaluation of CSR Activities Undertaken by Feroz Gandhi Unchahar Thermal Power Station (5 x 210 MW), Spn. NTPC Limited, Feroz Gandhi Unchahar Thermal Power Station, P.O.: Unchatrar, District Raebareli, Uttar Pradesh, March, 2016 (Project Cost: Rs. 7,25,000/-, duration: 9 months).
Socio-Economic Study for Buxar Thermal Power Project (2 x 660 MW) at Bihar, Spn. SJVN Thermal Power Limited, New Delhi, March, 2016 (Project Cost: Rs. 9,85,000/-, duration: 3 months).
Census and Socio-Economic Study for Railway Corridor of Khargone Super Thermal Power Project (2 x 660 MW), Spn. NTPC Limited, Khargone Super Thermal Power Project, November, 2015 (Project Cost: Rs. 6,85,000/-, duration: 3 months).
Undertaking Social Impact Assessment Study & Need Assessment Survey and CSR Activities for 4 x 800 MW Katni Thermal Power Project, Spn. Welspun Energy Madhya Pradesh Limited, Village: Bujbuja, Tehsil: Vijay Raghavgarh, Dist. Katni, MP, November, 2015 (Project Cost: Rs. 6,43,500/-, duration: 3 months).
Fire Safety Audit of State Transport Undertakings (STUs) Depots & Central Workshops of Greater Kolkata, Spn. Transport Department, Government of West Bengal, October, 2015 (Project Cost: Rs. 18,20,000/-, duration: 3 months).
Socio-Economic Study for Katwa Super Thermal Power Project (2 x 660 MW), Spn. NTPC Limited, Eastern Region Head Quarters, Lok Nayak Jai Prakash Bhawan, Patna, Bihar, September, 2015 (Project Cost: Rs. 9,85,000/-, duration: 7 months).
Social Impact Assessment Study, Social Audit, Need Assessment Survey and CSR Pan for Kawai Thermal Power Plant Expansion Project (2 x 800 MW), Spn. Adani Power Rajasthan Limited, Village: Kawai, Tehsil: Atru, Dist.: Baran, Rajasthan, February, 2015 (Project Cost: Rs. 5,85,000/-, duration: 3 months).
Need Assessment Survey for Farakka CSR Zone of FSTPS-NTPC, Spn. NTPC Limited, Farakka Super Thermal Power Station, P.O. Nabarun, District Murshidabad, July, 2013 (Project Cost: Rs. 7,65,000/-, duration: 5 months).
Socio-Economic Study for Gadarwara Super Thermal Power Project (4x660 MW), District: Narsingpur, MP, Spn. NTPC Limited, Western Region Headquarters, Samruddhi Venture Park, 2nd Floor, MIDC, Marol, Andheri (E), Mumbai, March, 2013 (Project Cost: Rs. 8,95,000/-, duration: 8 months).
Environmental & Social Impact Assessment Study For Intra State Transmission Line System (Tirora-Koradi-Akola-Aurangabad) as Per Equator Principles & IFC Guideline, Spn. Maharashtra Eastern Grid Power Transmission Company Limited, Ahmedabad, November, 2012 (Project Cost: Rs. 19,50,000/-, duration: 4 months).
Socio-Economic Impact Assessment Study, R&R Action Plan and CSR Activities for Thermal Power Project at Raniganj, Spn. Himachal EMTA Power Limited, Kolkata, November, 2012 (Project Cost: Rs. 6,95,000/-).
Social Impact Assessment Study for Tiroda Thermal Power Project, Spn. Adani Power Maharashtra Limited, Village: Tiroda, Dist.: Gondia, Maharashtra, March, 2012 (Project Cost: Rs. 5,85,000/-).
Social Impact Assessment Study for Kawai Thermal Power Project, Spn. Adani Power Rajasthan Limited, Village: Kawai, Tehsil: Atru, Dist.: Baran, Rajasthan, March, 2012 (Project Cost: Rs. 5,85,000/-).
Socio-Economic Study for Proposed Super Thermal Power Project (2x660 MW) near Village Selda, Town Sanawad in District: Khargone, MP, Spn. NTPC Limited, Western Region Headquarters, Samruddhi Venture Park, 2nd Floor, MIDC, Marol, Andheri (E), Mumbai, December, 2011 (Project Cost: Rs. 7,15,500/-).
Socio-Economic Impact Assessment Study for Katwa Super Thermal Power Plant, Srikhanda, Katwa, District Burdwan, West Bengal, Spn. West Bengal Power Development Corporation Ltd., Kolkata, November, 2011 (Project Cost: Rs. 7,00,000/-).
Social Impact Evaluation of CSR - CD Activities of Farakka Super Thermal Power Station, Spn. NTPC Limited, Farakka Super Thermal Power Station, P.O. Nabarun, District Murshidabad, January, 2011 (Project Cost: Rs. 6,95,000/-).
Socio-Economic Impact Assessment Study, R&R Action Plan and CSR Activities for Integrated Steel Plant, Cement Plant and Captive Power Plant at Durmut, Raghunathpur, Purulia, Spn. Jai Balaji Industries Limited, P.O. Rajbandh, Durgapur, August, 2010 (Project Cost: Rs. 20,00,000/-).
Socio-Economic Survey for Nabinagar Super Thermal Power Project (3 x 660 MW), New Nabinagar, District: Aurangabad, Bihar, Spn. Nabinagar Power Generating Co. Pvt. Ltd, Patna, August, 2010 (Project Cost: Rs. 9,95,000/-).
Status of Environmental Pollution Control in Large & Medium Scale Industries of West Bengal, Spn. West Bengal Pollution Control Board, Department of Environment, Government of West Bengal, March, 2010 (Project Cost: Rs. 8,00,000/-, duration: 12 months).
Socio-Economic Study for Abhijeet Group Project at Baraboni and Jamuria Blocks of Burdwan District (Development of Integrated Model for Sustainable and Inclusive Growth with a Special Emphasis on Shift from Agriculture to Industrial Base Economy), Spn. West Bengal Industrial Development Corporation, Government of West Bengal, December, 2008 (Project Cost: Rs. 7,00,000/-).
Socio-Economic Study for WBIDC Industrial Park at Saltora Block of Bankura District, Spn. West Bengal Industrial Development Corporation, Government of West Bengal, December, 2008 (Project Cost: Rs. 6,00,000/-).
Market Survey for Urban Livelihood Generation Programmes and Formulating Market Strategy & Action Plan for Urban Livelihood Generation Programmes (ULGPs), Spn. Change Management Unit, Kolkata Urban Services for the Poor (KUSP), Government of West Bengal, November 2008 (Project Cost: Rs. 11,00,000/-, duration: 12 months).
Socio-Economic Assessment Study and Preparation of R&R Action Plan for Rammam III Hydel Electric Power Project at Lodhama, Dist. Darjeeling, West Bengal , Spn. NTPC Hydro Limited, Darjeeling, West Bengal, October, 2008 (Project Cost: Rs. 6,00,000/-).
Comprehensive Environmental Impact Assessment Study for Multipurpose Riverine Jetties at HDC, Spn. HDC - CPT, Kolkata, September, 2007 (Project Cost: Rs. 6,00,000/-).
Socio-Economic Impact Assessment Study for Proposed Integrated Power Project (4 X 800 MW) Near Village Darlipali in Sundergarh District of Orissa, Spn. NTPC Limited (Formerly National Thermal Power Corporation), Patna, May, 2007 (Project Cost: Rs. 11,00,000/-).
Rapid Environmental Impact Assessment Study for Integrated Municipal Solid Waste Management System for West Bank Municipalities under KMA (Champdani, Baidyabati, Serampur, Rishra, Konnagar and Uttarpara-Kotrung) under Special Assistance for Project Formation (SAPROF) for the Kolkata Solid Waste Management Improvement Project, Spn. Kolkata Metropolitan Development Authority, Kolkata, as per Japan Bank for International Cooperation (JBIC) requirement, December, 2005 (Project Cost: Rs. 7,00,000/-).
Socio-Economic Impact Assessment Study for North Karanpura Super Thermal Power Project, Spn. NTPC Limited (Formerly National Thermal Power Corporation), Ranchi, November, 2005 (Project Cost: Rs. 11,00,000/-).
Socio-Economic Impact Assessment Study for Nabinagar NTPC – Railways Joint Venture Thermal Power Project (4 X 250 MW) in Aurangabad District, Bihar, Spn. National Thermal Power Corporation Ltd., Patna, April, 2005 (Project Cost: Rs. 8,00,000/-).
Research Projects (>3- 5 Lakh) – Ongoing
Ecological Study based on the Available Flora and Fauna along the Water Pipeline Route & Transmission Lines for Proposed Expansion of 2x800 MW Coal based Ultra Super Critical TPP of Raigarh Energy Generation Limited, Spn. Raigarh Energy Generation Limited, Village: Chhote Bhandar, PO: Bade Bhandar, Tehsil: Pussore, Dist,: Raigarh, January, 2024 (Project Cost: Rs. 4,13,000/-, duration: 6 months).
Ecological Study based on the Available Flora and Fauna along the Water Pipeline Route & Transmission Lines for Proposed Expansion of 2x800 MW Coal based Ultra Super Critical TPP of Raipur Energy Limited, Spn. Adani Raipur Energy Limited, Village: Raikheda, Block: Tilda, Dist.: Raipur, Chattisgarh, January, 2024 (Project Cost: Rs. 4,13,000/-, duration: 6 months).
Ecological Study for Proposed Chappar USCTPP (4 x 800 MW) at Village Kokrajhar, Assam, Spn Adani Power Ltd, LGBI Airport, Borjhar, Guwahati, Kamrup, Assam (Project Cost: Rs. 4,13,000/-, duration: 8 months).
Social Impact Assessment (SIA) Study, Corporate Social Responsibility (CSR) Study, Need Based Assessment (NBA) Survey and Community Engagement/Development Plan and Resettlement & Rehabilitation (R&R) Study for Proposed 1600 (2 x 800) MW Coal Based Ultra Super Critical Thermal Power Plant at Madhya Pradesh (Phase I), Spn. Pench Thermal Energy (MP) Limited, Adani, Madhya Pradesh (Project Cost: Rs. 3,90,000/-, duration: 3 month).
Ecological Study & Site Specific Wildlife Conservation and Management Plan for Proposed Expansion Project of 2x800 MW (Phase-III) Ultra Super Critical Coal Based Thermal Power Plant at Village Bandhoura, Karsualal Tehsil Waidhan Distt Singrauli, MP, Spn. Mahan Energen Limited, Singrauli, Madhya Pradesh (Project Cost: Rs. 4,13,000/- duration: 6 months).
Ecological Study and Wildlife Conservation and Management Plan for Proposed SCTPP (2x660+2x800 MW TPP) of KPL at District Korba, Chhattisgarh, Spn. Korba Power Limited, Korba, Chattisgarh (Project Cost: Rs. 4,13,000/- duration: 3 year).
Decarbonization Action Plan for Korba Thermal Power Plant, Spn. Adani Power, Korba Power Limited, Vill-Pathadi, Tehsil-Korba Korba (Chhattisgarh), March, 2025
Ecological study based on the available flora and fauna at the project site and along the Water Pipeline Route & Transmission Lines and prepare the report to comply with the relevant conditions mentioned in Terms of reference (ToR) and to follow up as per EIA Notification & its amendment from time to time for proposed project of 3 x800 MW Ultra Super-Critical Thermal Power at Orissa Thermal Energy Private Limited, Spn. Orissa Thermal Energy Private Limited, Ahmedabad (Project Cost: Rs. 4,13,000/- duration: 3 year).
Ecological study based on the available flora and fauna at the project site and along the Water Pipeline Route & Transmission Lines and prepare the report in terms to follow up as per EIA Notification & its amendment from time to time for proposed expansion of 4x800 MW (Phase-II) Coal based Ultra Supercritical Thermal Power Project, Spn. Adani Power Ltd., Village: Kawai, District: Baran, Rajasthan (Project Cost: Rs. 4,13,000/- duration: 6 months).
Ecological Study and Flora & Fauna Conservation Plan for 4 X 800 MW (Phase-II) Kawai USCTPP at District Baran, Rajasthan, Spn. Adani Power Limited, Village: Kawai, Taluka: Atru Baran, Rajasthan (Project Cost: Rs. 4,13,000/- duration: 6 months).
Ecological Assessment and Wildlife Conservation and Management Plan for Proposed USCTPP of APRL at Baran District, Rajasthan, Spn. Adani Power Rajasthan Limited Baran, Rajasthan, June, 2025.
Ecological study based on the available flora and fauna at the project site and along the Water Pipeline Route & Transmission Lines and prepare the report in terms to follow up as per EIA Notification & its amendment from time to time for proposed 2x800 MW Coal based Ultra Supercritical Thermal Power Project, Spn. Mirzapur Thermal Energy (UP) Pvt. Ltd., Mirzapur, U.P. (Project Cost: Rs. 4,13,000/- duration: 6 months).
Ecological Assessment and Wildlife Conservation and Management Plan for Proposed 2x800 MW Ultra Super Critical Coal Based Thermal Power Plant (USCTPP) of Mirzapur Thermal Energy (UP) Pvt. Ltd. (MTEUPPL) at Mirzapur District, UP, Spn. Mirzapur Thermal Energy (UP) Pvt. Ltd., Mirzapur, U.P. (Project Cost: Rs. 4,13,000/- duration: 6 months).
Biodiversity (Ecological) Assessment and Wildlife Conservation & Management Plan for Proposed USCTPP of MTEUPPL at Mirzapur District, U.P., Spn. Mirzapur Thermal Energy Uttar Pradesh Private Limited Mirzapur, Uttar Pradesh, January, 2025.
Social Audit and Social lmpact Assessment Study for 4620 MW Mundra Thermal Power Plant at Village Tunda & Siracha, Tal Mundra, Gujrat, Spn. Adani infrastructure Management Services Limited, Mundra Thermal Power Project, Village Tunda & Siracha, Tal: Mundra, Dist.: Kutch, Gujarat (Project Cost: Rs. 4,72,000/-, duration: 3 months).
Environmental & Social Impact Assessment Study and Formulation of Environmental & Social Management Framework for conversion of OH to UG Distribution Network at Siliguri Town under World Bank Project (WBEDGMP), Spn. West Bengal State Electricity Distribution Company Limited, Kolkata, August, 2023 (Project Cost: Rs. 4,00,000/-, Duration: 4 month)
Social Audit and Social Impact Assessment Study for 3300 MW Tiroda Thermal Power Plant at Village Tiroda, District Gondia, Maharashtra, Spn. Adani Power Maharashtra Limited, Village: Tiroda, Dist.: Gondia, Maharashtra (Project Cost: Rs. 4,10,000/-, duration: 3 month).
Preparation of State Youth Policy, Spn. Departments of Sports & Youth Services, Government of West Bengal (Project Cost: Rs. 4,55,000/-, duration: 3 months).
Research Projects (>3- 5 Lakh) – Completed
Karsua, Dist.: Singrauli, Madhya Pradesh, Spn. Mahan Energen Limited, Singrauli, Madhya Pradesh, June, 2022 (Project Cost: Rs. 4,13,000/- duration: 6 months).
Social Impact Evaluation and Social Audit for Kawai Thermal Power Plant Expansion Project (2 x 800 MW), Spn. Adani Power Rajasthan Limited, Village: Kawai, Tehsil: Atru, Dist.: Baran, Rajasthan, February, 2022 (Project Cost: Rs. 4,05,000/-, duration: 3 months). (94)
Social Audit and Social Impact Evaluation of CSR Activities for Raigarh Thermal Power Plant (1 x 600 MW), Spn. Raigarh Energy Generation Limited, Village: Chhote Bhandar, PO: Bade Bhandar, Tehsil: Pussore, Dist,: Raigarh, Chattisgarh, March, 2023 (Project Cost: Rs. 4,50,000/- (4,05,000/-), duration: 3 month).
Research Projects (>3- 5 Lakh) – Completed
Social Audit and Social Impact Assessment Study for Raipur Thermal Power Plant (2 x 685 MW) of Raipur Energy Limited, Spn. Adani Raipur Energy Limited, Village: Raikheda, Block: Tilda, Dist.: Raipur, October, 2020 (Project Cost: Rs. 4,78,500/- (4,50,000/-), duration: 3 month).
Environmental Audit for Sasan Ultra Mega Power Project at Village Siddhikhurd, District Singrauli, Madhya Pradesh, Spn. Sasan Power Limited, Reliance, April, 2016 (Project Cost: Rs. 4,04,700/-, duration: 3 months).
Social Impact Evaluation and Social Audit for Mundra Thermal Power Plant (4620 MW), Spn. Adani Power Maharashtra Limited, Mundra Thermal Power Plant, Tunda and Wandh Village, Mundra Taluka, Kutchh District, Gujarat, March 2015 (Project Cost: Rs. 4,35,000/-, duration: 2 months).
Social Impact Evaluation and Social Audit for Tiroda ThermaL Power Plant (5 x 660 MW), Spn. Adani Power Maharashtra Limited, Tiroda Thermal Power Plant, Tiroda, District Gondia, Maharashtra, March 2015 (Project Cost: Rs. 4,35,000/-, duration: 2 months).
Rapid Environmental Impact Assessment Study for Subhas Sarobar Beautification Project, Spn. West Bengal Tourism Development Corporation Limited, Kolkata, May, 2011 (Project Cost: Rs. 3,60,000/-).
Socio-Economic Study for Expansion of Muzaffarpur Thermal Power Station (2 x 195 MW) at Kanti, Muzaffarpur, Spn. Kanti Bijlee Utpadan Nigam Limited, Muzaffarpur Thermal Power Station, P.O. Kanti Thermal, Dist. Muzaffarpur, Bihar, January, 2011 (Project Cost: Rs. 4,95,000/-).
Assessment of Performance & Impact of Implementation of Mangrove Regeneration Programme in Charlands of Sundarban, Spn. Sundarban Development Board, Government of West Bengal, 2011 (Project Cost: Rs. 4,95,000/-, duration: 3 months).
Assistance in Formulation & Implementation of Resettlement & Rehabilitation Action Plan for Project Affected Persons of North Karanpura Super Thermal Power Project, Spn. NTPC Limited (Formerly National Thermal Power Corporation), Ranchi as per JBIC Requirement, December, 2006 (Project Cost: Rs. 4,00,000/-).
Rapid Environmental Impact Assessment Study of the Proposed Kulpi Port (Near Diamond Harbour at West Bengal) Project and Special Economic Zone (SEZ) at Kulpi, Spn. Bengal Port Private Ltd., Kolkata in association with M/S Telos Consultancy Services (P) Ltd., Mumbai, July, 2006 (Project Cost: Rs. 4,00,000/-).
Social Impact Assessment Study and Resettlement & Rehabilitation Action Plan for Sagardighi Thermal Power Project, Spn. West Bengal Power Development Corporation Ltd., Kolkata, June, 2004 (Project Cost: Rs. 4,65,000/-).
Research Projects (0.25-3 Lakh) – Completed
Environmental and Social Impact Assessment (ESIA) Study for Construction of 45 MLD STP & Associated Infrastructure at Bhagalpur, Bihar, Spn. Adani Bhagalpur Waste Water Limited, Ahmedabad, October, 2022 (Project Cost: Rs. 2,95,000/- Duration: 4 month).
Environmental Audit for 5 x 660 MW Tiroda Thermal Power Plant at Tiroda, Gondia, Maharashtra as Per Equator Principles & IFC Guideline, Spn. Adani Power Maharashtra Limited, Village: Tiroda, Dist.: Gondia, Maharashtra, January, 2017 (Project Cost: Rs. 2,95,000/-, duration: 3 months).
Environmental Audit for Mundra ThermaL Power Plant (4620 MW), Spn. Adani Power Limited, Mundra Thermal Power Plant, Tunda and Wandh Village, Mundra Taluka, Kutchh District, Gujarat, January, 2017 (Project Cost: Rs. 2,95,000/-, duration: 3 months).
Fire Safety Audit of Tarak Nath Palit Siksha Prangan of the University of Calcutta at 35, B. C. Road, Kolkata – 19, Spn. University of Calcutta, December, 2016 (Project Cost: Rs. 1,00,000/-, duration: 2 months).
Environmental Audit for 2 x 660 MW Kawai Thermal Power Plant at Kawai, Barun, Rajasthan as Per Equator Principles & IFC Guideline, Spn. Adani Power Rajasthan Limited, Village: Kawai, Tehsil: Atru, Dist.: Baran, Rajasthan, January 2014 (Project Cost: Rs. 2,95,000/-, duration: 3 months).
Environmental Audit for 5 x 660 MW Tiroda Thermal Power Plant at Tiroda, Gondia, Maharashtra as Per Equator Principles & IFC Guideline, Spn. Adani Power Maharashtra Limited, Village: Tiroda, Dist.: Gondia, Maharashtra, January 2014 (Project Cost: Rs. 2,95,000/-, duration: 3 months).
Rapid Environmental Impact Assessment Study for Dakshineswar Temple Complex Beautification Project, Spn. West Bengal Tourism Development Corporation Limited, Kolkata, January, 2012 (Project Cost: Rs. 2,50,000/-).
Evaluation of Environment Compliance Assistance Centre, Spn. West Bengal Pollution Control Board, Department of Environment, Government of West Bengal with Active Support from the Asian Environmental Compliance and Enforcement Network (AECEN) in Collaboration with International Development Agencies like the World Bank, USEPA, USAID, OECD and ADB, March, 2011 (Project Cost: Rs. 1,07,500/-, duration: 3 months).
Assessment of Enviro-Economic Rationale of Ship Recycling, Spn. West Bengal Ship-Breakers’ Association, Kolkata, June, 2010 (Project Cost: Rs. 1,00,000/-, duration: 3 months).
Impact Assessment Study of Vocational Training Conducted by Barrackpore Municipality under SJSRY, KUSP and ICF Scheme during Last Five Years (2003-2004 to 2008-2009), Spn. Barrackpore Municipality, Barrackpore, 24 Parganas (N), WB, May, 2010 (Project Cost: Rs. 3,00,000/-, duration: 4 months).
Rapid Environmental Impact Assessment Study of Subarna Bhoomi Housing Project of BDCPHL, Spn. Bengal D C Paul Housing Limited (BDCPHL), Kolkata, December, 2008 (Project Cost: Rs. 2,00,000/-).
Rapid Environmental Impact Assessment Study of Construction of Water Reservoir at Hukaharania Khal, Kultali Block, 24 Pgs (N), Spn. Sundarban Development Board, Department of Sundarban Affair, Government of West Bengal, Kolkata, July, 2006 (Project Cost: Rs. 1,00,000/-).
Rapid Environmental Impact Assessment Study of Basundhara Housing Project, Spn. Rupayan Construction, Kolkata, May, 2006 (Project Cost: Rs. 1,50,000/-).
Possibility of an Export Hub in Fulia Region of Nadia District, West Bengal, Spn. Export-Import Bank of India, Mumbai, December, 2005 (Project Cost: Rs. 1,50,000/-).
Rapid Environmental Impact Assessment Study of Shal-Piyali Housing Project of DCPGCPL, Spn. D C Paul Group Construction Pvt. Ltd. (DCPGCPL), Kolkata, June, 2005 (Project Cost: Rs. 1,50,000/-).
Rapid Environmental Impact Assessment Study of Salboni Housing Project of DCPGCPL, Spn. D C Paul Group Construction Pvt. Ltd. (DCPGCPL), Kolkata, March, 2005 (Project Cost: Rs. 1,60,000/-).
Rapid Environmental Impact Assessment Study of Amrakunja Housing Project of BGA, Spn. B. Ghosh & Associates (BGA), Kolkata, January 2005 (Project Cost: Rs. 1,60,000/-).
Rapid Environmental Impact Assessment Study of Purba Housing Project of KMDA, Spn. Kolkata Metropolitan Development Authority, Kolkata, January, 2005 (Project Cost: Rs. 2,00,000/-).
Rapid Environmental Impact Assessment Study of Ashabari Housing Project of KMDA, Spn. Kolkata Metropolitan Development Authority, Kolkata, December, 2004 (Project Cost: Rs. 2,00,000/-).
Rapid Environmental Impact Assessment of Greenwood Nook Housing Project, Spn. Bengal Shrachi Housing Development Limited, Kolkata, December, 2003 (Project Cost: Rs. 1,60,000/-).
Rapid Environmental Impact Assessment of Peerless Nagar Panihati, Spn. Peerless Developers Limited, Kolkata, April, 2003 (Project Cost: Rs. 2,00,000/-).
Other Research Project – Completed (As Project Leader)
Consumer Behaviour of FMCG Product – Toothpaste: A Market Research on Kolkata, under the Department of MBA, Indian Institute of Social Welfare & Business Management, Kolkata, February 2003 (Duration: 3 months).
Selection of Environmentally Compatible Site for Industrial Estate in the District of Bankura, West Bengal under the West Bengal State Council of Science & Technology, Bikash Bhavan, Kolkata and the Department of Environment, Government of West Bengal, September, 1998 (Duration: 3 months).
Research Project – Completed (As Project Team Member)
Assistance in Recruitment of Deputy Ranger/Foresters, Spn. Directorate of Forests, Government of West Bengal, December, 2008 (Project Cost: Rs. 22,00,000/-).
Integrated System Design Study (SDS), Spn. West Bengal Minorities’ Development and Finance Corporation, Government of West Bengal, Kolkata, February 2006 (Project Cost: Rs. 1,00,000/-, duration: 4 months).
Establishment of Sundarban Biosphere Resource Information Center (Under UNDP Project on Biodiversity Conservation in Indian Sundarbans), in association with Botanical Survey of India, Spn. Sundarbans Biosphere Reserve, Directorate of Forest, Government of West Bengal, Kolkata, December, 2005 (Project Cost: Rs. 20,50,000/-).
System Requirement Study (SRS), Spn. West Bengal Minorities’ Development and Finance Corporation, Government of West Bengal, Kolkata, July, 2005 (Project Cost: Rs. 1,00,000/-).
Social Impact Assessment and Gender Equity Plan for M&I’s Proposed Activities at MBE Works, Kumardhubi (India), Spn. M&I Heat Transfer Limited, Mississauga, Canada, as per Requirement of Canadian Government, January, 2004 (Project Cost: Rs. 1,00,000/-).
Health & Safety Assessment and Training Need Assessment for M&I’s Proposed Activities at MBE Works, Kumardhubi (India), Spn. M&I Heat Transfer Limited, Mississauga, Canada, as per Requirement of Canadian Government, January, 2004 (Project Cost: Rs. 1,00,000/-).
Comprehensive Environmental Impact Assessment and Environmental Management Plan for M&I’s Proposed Activities at MBE Works, Kumardhubi (India), Spn. M&I Heat Transfer Limited, Mississauga, Canada, as per Requirement of Canadian Government, December, 2003 (Project Cost: Rs. 1,50,000/-).
Preparation of Status Report on Conservation & Management of Biodiversity of Indian Sundarbans as a part of preparation of UNDP funded Project Document on Conservation of Biodiversity of Sundarbans through a Two-Country Approach, Spn. United Nations Development Programme (UNDP), New Delhi and Directorate of Sundarbans Biosphere Reserve, Government of West Bengal, Kolkata, June, 2002 (Project Cost: Rs. 1,60,000/-).
Socio-economic Impact Assessment Study for North Karanpura Super Thermal Power Project, Spn. National Thermal Power Corporation Ltd., Patna, as per World Bank Requirement, January, 2002 (Project Cost: Rs. 9,00,000/-).
Rapid Environmental Impact Assessment of Shipbreaking Activities at Calcutta Port, Spn. West Bengal Ship-Breakers’ Association, Kolkata, February, 2001 (Project Cost: Rs. 3,50,000/-).
Social Impact Analysis of Project Affected Persons of Canal Rehabilitation Project, Calcutta Municipal Corporation as per Asian Development Bank requirement, 2000.
Analysis of Kharoon River Water Quality for Raipur Engineering Co. Ltd. (Steel Plant Division), Siltara Growth Centre, Siltara, Raipur (M.P.), Spn. Surveillance Engineering Co. Pvt. Ltd., Kolkata, November, 1999 (Project Cost: Rs. 1,00,000/-).
Preparation of Resettlement Action Plan for Four-Laning & Strengthening of the Existing Two Lane from Km 180 (Aurangabad) to Km 398.75 (Barwa Adda) Section NH – 2 (Package V), Spn. National Highways Authority of India (Ministry of Surface Transport), Bihar, as per World Bank Requirement, September, 1999 (Project Cost: Rs. 3,50,000/-).
Monitoring and Analysis of Different Environmental Parameters for ITC Ltd., Corporate Head Quarters, Kolkata, ITC Ltd., Corporate Head Quarters, Kolkata, August, 1999 (Project Cost: Rs. 1,00,000/-).
Environmental Conservation in Rural area under Participatory Management Programme for the villages of Chowgeria and Beraberia, P.S.: Panskura, Dist.: Midnapore, Spn. Department of Environment, Government of West Bengal, April, 1999.
Research Guidance (PhD/M.Phil)
M.Phil (Degree Awarded Only):
Following 2 students have been awarded M.Phil under the guidance of the undersigned in 2016 (2015-17):
1. Name of Student: Mr. Rajat Ghosh
Topic of Research: Factors Influencing Women Consumers’ Buying Behaviour for Organized Retail Stores in Kolkata
2. Name of Student: Ms. Aparupa Bhattacharya
Topic of Research: Exploration of Human Factors: A Study on Influencing Factors of Motivation in Kolkata
Following 2 students have been awarded M.Phil under the guidance of the undersigned in 2017 (2016-18):
Research Guidance (PhD/M.phil)
Following 2 students have been awarded M.Phil under the guidance of the undersigned in 2017 (2016-18):
1. Name of Student: Mr. Amit Kumar Das
Topic of Research: A Comparative Study on Brand Preference of Cement With Respect to Urban Vs. Metropolitan City in West Bengal
2. Name of Student: Ms. Anwesha Sahoo
Topic of Research: A Study on The Blooming Digital India, A special focus to Rural Digitalization
Following 1 student have been awarded M.Phil under the guidance of the undersigned in 2018 (2017-19):
1. Name of Student: Ms. Puja Dey
Topic of Research: Management of Patient Wait Time in Emergency Department – Apollo Gleneagles Hospital, Kolkata
Following 1 student have been awarded M.Phil under the guidance of the undersigned in 2019 (2018-20)
1. Name of Student: Ms. Sadgi Agarwal
Topic of Research: Impact of Covid 19 on Indian IT Sector
Following 1 student is undertaking M.Phil research under the guidance of the undersigned in 2020 (2019-21):
1. Name of Student: Ms. Arunima Rudra
Topic of Research: Family Purchase Decision Making: Exploring Child Influence Behaviour
b) PhD (Degree Awarded):
Name of Student: Mr. Zakir H Molla, GM-CSR, Hindustan Petroleum Corporation Ltd, Mumbai
Title of Thesis: Corporate Social Responsibilities in Select Public Sector Oil Companies in India: A Critical Assessment
Year of Selection: 2014
Registration No.: 6232/PhD (B.M.)Proceed/2014 dated 8th Sept, 2014
Name of University: University of Calcutta
Department: Department of Business Management Awarded: Dec 31, 2019 vide ref. no. 00030/PhD(B.M.) dated 2nd Jan, 2020
Designation of the Undersigned: Supervisor
Name of Student: Ms. Nupur Sengupta (Duttagupta), Asstt. Environmental Engineer,
West Bengal Pollution Control Board (WBPCB)
Title of Thesis: Development of an Empirical Model for Assessment of Environmental Sustainability of Select Industrial Sectors in West Bengal
Year of Selection: 2012
Registration No.: 1531/PhD (B.M.)Proceed/2014 dated 4th Mar, 2014
Name of University: University of Calcutta
Department: Department of Business Management Awarded: December 18, 2019 vide ref no. 09049/PhD(B.M.) dated 18th Dec, 2019
Designation of the Undersigned: Joint Supervisor
Following students are undertaking doctoral level research under the guidance of the undersigned:
1. Name of Student: Ms. Sriradha Datta Chaudhuri
Title of Thesis: Impact of Chatbots on Customer Engagement and Satisfaction: An Empirical Study across Different Industrial Sectors in India
Date of Enrolment: 05.09.2024
Registration No.: 04139/ PhD (B.M.)Proceed/2025 dated 10th June, 2025
Name of University: University of Calcutta
Department: Department of Public Systems, Social Welfare and Management
Designation of the Undersigned: Supervisor
2. Name of Student: Ms. Mousumi Basu, Assistant Professor, City College of Commerce and Business Administration
Title of Thesis: E-Banking And Banking Sector Growth in India: An Empirical Analysis
Date of Enrolment: 25.07.2019
Registration No.: 06395/PhD(Com.)Proceed/2021 dated 30th September, 2021
Name of University: University of Calcutta
Department: Department of Commerce
Designation of the Undersigned: Supervisor
3. Name of Student: Ms. Barnali Saha, LLM, M.Phil
Title of Thesis: An Investigation into Determinants of and Deterrents to Cross Border Trade: Challenges and Prospects for India
Date of Enrolment: 25.07.2019
Registration No.: 01584/PhD (B.M.)Proceed/2022 dared 02.03.2022
Name of University: University of Calcutta
Department: Department of Business Management
Designation of the Undersigned: Supervisor
4. Name of Student: Ms. Paramita Ganguly
Title of Thesis: Assessment of Prospects and Challenges in Adoption of Green Supply Chain Management Practices in Developed & Developing Economies
Date of Enrolment: 31.03.2021
Registration No.: 02888/PhD(B.M.)/Proceed/2023 dated 27th April, 2023
Date of Registration: 20.09.2022
Name of University: University of Calcutta
Department: Department of Public Systems, Social Welfare & Management
Designation of the Undersigned: Joint Supervisor
5. Name of Student: Ms. Sanhati Sengupta (JRF under Savitribai Jyotirao Phule Single Girl Child Fellowship (SJSGC) 2022-23)
Title of Thesis: Exploring the Behaviour of Indian Working Women in Regard to Investment Decision Pertaining to Secondary Market
Date of Enrolment: 31.03.2021
Registration No.: 07810/PhD(B.M.)Proceed/2022 dated 20.09.2022
Name of University: University of Calcutta
Department: Department of Public Systems, Social Welfare & Management
Designation of the Undersigned: Supervisor
6. Name of Student: Ms. Baisakhi Datta, Faculty, Women’s College, Calcutta
Title of Thesis: Assessment of Vulnerability of Indian Coastal Area Due to Natural Calamities – A Case Study of Sunderban
Date of Enrolment: 05.05.2022
Registration No.: 04369/Ph.D,(B.M.)Proceed/2024
Name of University: University of Calcutta
Department: Department of Public Systems, Social Welfare & Management
Designation of the Undersigned: Joint Supervisor
7. Name of Student: Ms. Ittequa Turkan (NET-JRF dated 12.03.2022)
Title of Thesis: Investigating Green Consumer Behaviour On Personal Care Products: An Empirical Study in Metro Cities of India
Date of Enrolment: 02.05.2022
Registration No.: 01273/PhD(Com.)Proceed/2024 dated 20th Feb, 2024
Name of University: University of Calcutta
Department: Department of Commerce
Designation of the Undersigned: Supervisor
8. Name of Student: Ms. Srijita Mandal, Faculty, Maharaja Sris Chandra College
Title of Thesis: Corporate Sustainability and Financial Performance - A Study on Select Companies in India
Date of Enrolment: 02.05.2022
Registration No.: 02761/PhD(Com.)Proceed/2024 dated 19.04.2024
Name of University: University of Calcutta
Department: Department of Commerce
Designation of the Undersigned: Supervisor
FDP Attended
Dr. Sarbani Mitra attended a One-day Faculty Development Programme on Application of GenAI Prompt Engineering in Management Research, at IISWBM, Kolkata, June 5, 2025.
Dr. Sarbani Mitra attended a Two-day Faculty Development Programme on Case Method in Teaching and Writing, at St. Xavier’s University, Kolkata, July 24-25, 2023.
7 Days Workshop on Research Methodology and Statistical Package for Social Science (SPSS), Org. by Indian Statistical Institute, Biological Anthropology Unit, Kolkata, Feb 9-16, 2022.
Workshop on Case Writing, Teaching and Research, Org. by Indian Institute of Management Calcutta Case Research Centre (IIMCCRC), June 14-15, 2012.
Five-day Training Programme for Waste Minimization Circle (WMC) Facilitators on Waste Minimization in Small & Medium Scale Industries (WMC Phase III), Org. by the Environment Group, National Productivity Council (NPC), Government of India, Spn, by MoEF, New Delhi, October 1 – 5, 2007.
Certificate Course on Disaster Management, Org. by IISWBM, Kolkata, October 30 – December 15, 2006.
Programme on Doctoral Summer School, Org. by Xavier Institute of Management, Bhubaneswar (XIMB), June 4 – 9, 2005.
2nd Regional Workshop on Disaster Management, Org. by Institute for Sustainable Eco Development (IFSED); Applied Mechanics Department, Bengal Engineering & Science University, Shibpur, Howrah and Shri Ramkrishna Ashram, Nimpith, Sundarban, Spn. by Department of Science and Technology, Government of India, February 21 – 23, 2005.
3-day Programme on Statistical Analysis for Research Workers, Org. by Indian Association for Productivity, Quality & Reliability, Kolkata, September 20 – 22, 2004.
Training Programme on Environmental Planning & Pollution Control for Officers of Indian Ports, Org. by Indian Institute of Port Management, Kolkata, June 23 – 27, 2003.
Training Course on Social Development and Resettlement, Org. by Administrative Training Institute (ATI), Government of West Bengal, Kolkata and Asian Development Bank (ADB), May 14 – 18, 2001.
Training Course on Solid and Hazardous Waste Management, Org. by All India Institute of Hygiene and Public Health, Kolkata, Spn. by Ministry of Health & Family Welfare, Government of India, Conducted by the Department of Sanitary Engineering, All India Institute of Hygiene and Public Health, Kolkata, March 21 – 24, 2000.
Management Development Programme on Environment Audit and Implementation of Environment Management Systems (EMS), Org. by Environment Management Centre of Indian Chamber of Commerce and United States – Asia Environmental Partnership – Clean Technology and Environmental Management, September 23 – 24, 1999.
Workshop on Waste Management at Calcutta, Org. by Environment Management Centre of Indian Chamber of Commerce and United States – Asia Environmental Partnership – Clean Technology and Environmental Management, May 3 and 6, 1999.